Product description
1. Clean the glue application surface and remove dust, oil stains, old glue, floating paint, rust, silt, loose layers, etc.
2. Open the lid and press the pipe mouth against the glue application surface or leaking point to squeeze glue. Press as tight as needed. Make sure the amount of glue is sufficient to fill the gap.
3. Let it stand for 24 hours until the colloid is completely solidified before use.
1. For unknown materials, an adhesion test should be performed before use to confirm the applicability of the product.
2. Not suitable for use in oily environments or strong acid and alkali environments
3. If the temperature of the glue application surface is lower than 5 or higher than 40, construction should not be carried out to avoid colloid foaming or affecting curing.
4. Do not ingest, keep out of reach of children! This product is non-dangerous goods and can be stored and transported as required for non-dangerous goods.