About this product
- Contains Dangerous Goods?:Tidak
Product description
Net content: 1000ML/300ML
1. A mighty sealant that effectively and instantly seals most surfaces with any materials.
2. We are happy to offer you a product that will easily and instantly seal and repair broken surfaces. Introducing the innovative sealer mighty paste.
3. Innovative sealer mighty paste is an advanced sealant paste that is formulated to effectively seals, and repairs broken surfaces. It is a water-based sealant that is paintable and can be used to waterproof a large variety of surfaces.
4. It provides a good toughness but flexible layer of protection to the applied surface. It is leak proof and can be applied on wet surfaces with high bonding strength. It is transparent and has non-yellowing substance.
5. Has a strong adhesive action that it can easily and quickly bind to most surfaces that is subjected to and can be particularly useful wherein protection is required. It can be applied and provide the kind of protection needed in no time. It is long-lasting and permanent. it is suitable for sealing joints and crevice and leaks and can be used to all construction materials. it can be applied to painted and non-painted surfaces.
6. Clean the tile floor before construction to keep the floor free of dirty water stains.
If the gap between the tiles is too deep, first fill the gap with the plugging king
The product does not need to be mixed and can be used directly after opening the lid. Before construction, the floor drain should be blocked to prevent the leakage of glue.
7. For large-scale construction, it is recommended to the first wall and then the ground, first inside and then outside, so as to facilitate the construction personnel to exit, and the colloid should be brushed as thinly as possible during construction (film-forming drying is faster),
It is recommended to paint 2 times (better effect) on key positions (toilet edge/floor drain/corner gap) and other parts.
The construction should be completed by one-time brushing to form a continuous and flat waterproof membrane on the base surface.
8. It is recommended to ventilate the place after construction.
9.the surface will dry after 2 hours, and a film can be formed in 5 hours. The lower the temperature, the slower the curing (low-temperature curing time maybe will be affected).
10.(Due to the difference in coating thickness and ambient temperature, the curing time will be slightly different, subject to the actual construction curing time)