Substrate : Cement, Masonry, Tiles & MetalTexture : High GlossAbrasion : Good resistance to abrasion and mechanical damageAdhesion : Excellent on correctly prepared surfacesApplication methods : Brush, roller, compressed air spray and airless spray. * Mixing Ratio : 4 : 1 (By volume, base to hardener) Drying Time at 25°C to 30°C : Touch Dry 2- 3 hours / Hard Dry 16 hours Recoating interval : Minimum 16 hours No of coat(s) : 1 -3 coats*** Theoretical coverage : 6.4 -10.2 square meter per litre per coatImportant Note:* 4 parts by volume of Epoxy Primer / Finish (Base) to 1 part by volume of Epoxy Primer / Finish (Hardener). Stir the content of the base component, continue stirring and gradually add the total contents of the hardener component, continue stirring until a homogeneous mix is obtained.** Drying time will become remarkably delayed under low temperature. Overcoating the previous coat of Epoxy Finish should be done within 6 ~ 7 days but preferably as soon as possible after it has been allowed 16 hours drying or else, it is desirable to roughen it by dry sanding with sandpaper before it is overcoated. This is to ensure proper intercoat adhesion. Exposure of the paint film to water, chemical and abrasion should be avoided as far as possible before full cure of the coating. When chalking occurs, chalks should be removed by water washing. Allow the surface to dry thoroughly prior to overcoating. *** This theoretical coverage rate has been calculated from the volume solids of the material and is related to the amount of coating applied onto a perfectly smooth surface without wastage.The colour shades displayed are indicative and not precise representations of our actual paint colours which may vary based on your screen resolutions and settings.